What to Expect September 2nd – September 15th

*Elevator Upgrades: Starting September 16th – South Tower (Medical & Dental) elevator will be out of service.

2nd Floor: For access by car, please park in P4. For wheelchair access, use North Tower elevator (next to White Spot) for pedestrian walkway.

3rd Floor: For access by car, please park in P5. For access by foot, please use escalator and stairs. There is no elevator access for 3rd floor.

 

41st Avenue:

Entrance #1 is CLOSED until further notice. Entrance #2 will serve as the temporary main entrance to the shopping centre.

45th Avenue:

Entrances #7 and #8 will be CLOSED. Estimated re-opening in October.

Cambie Street:

All entrances OPEN.

Parking Closures/Rerouting:

The west side of the North Tower parking is CLOSED on all levels P1, P2, P3, P4, and Rooftop.

An area in front of the Vancouver Public Library is CLOSED off to be used as a construction staging area (please see map).

A small area within the Safeway parking lot is blocked off. Please watch for machines and equipment.

Please Be Advised:

There is currently test drilling occurring in the Safeway parking lot. The work area will be fenced off and flaggers will be on-site to assist with traffic when drilling will be done in the drive isles. Please use caution and watch for pedestrians and workers. Work is expected to be completed in mid-September.

41st Avenue and Cambie corridors: Due to civil upgrades, please watch your speed as there are many workers near the roadways.

The Cambie Street entrance, stairs, and pedestrian ramp to the Food Court are now closed as we build a new entrance to the shopping centre. We expect to re-open the doors Holiday 2019. For accessibility, please reroute through White Spot entrance/Canada Line Plaza to access Cambie Street.

The underpass to exit westbound on 41st is now permanently CLOSED to allow for utility upgrades. Cars wanting to travel westbound on 41st Avenue should use Exit #4 onto northbound Cambie Street.

We are currently doing upgrades to the upper parking deck. Although parking is available, there will be minor detours. Please watch for construction.

Entrances to the North Tower is CLOSED. Please re-route through South Tower.

Cambie Entrance #3 is ENTER ONLY. Vehicles will be able to exit the parkade in front of the Bay with an option to use 41st Avenue Exit #2 to travel eastbound or drive around the shopping centre to Cambie Exit #4 to proceed north or south on Cambie Street. This work is expected to complete in January 2020.

Look Ahead:

New street light with westbound access to 41st Avenue will be coming in late 2019.

 

 

Please click here to see maps.

Please refer to “Where To Shop” section of our website for the most current store openings and re-locations.