41st Avenue:

April 1st – OctoberEntrance #5 will be CLOSED due to utility upgrade work along 41st Avenue.

45th Avenue:

All entrances OPEN.

Cambie Street:

Entrance #7b to Parking Level 1 (P1) will be CLOSED until November. Customers can use Entrance #7a to access the parking areas and EV chargers. Exit #7c to Cambie Street will remain OPEN.

Parking Closures:

The west side of the North Tower parking is CLOSED on all levels P1, P2, P3, P4, and Rooftop. Entrances to the shopping centre off W. 41st are OPEN (please see maps).

An area of P1, underneath the GAP, will be CLOSED permanently for structural upgrades (please see map).

An area from the Public Library has now been CLOSED off to be used as a construction staging area (please see map).

Please be advised:

April 12th – 19th – Safeway: Drilling rigs will be visible in the parking lot. Please drive slowly and watch for workers. Safeway will remain OPEN.

April 16th – The car wash will be closed until 12Noon due to paving.

41st Avenue and Cambie corridors: Due to civil upgrades, please watch your speed as there are many workers near the roadways.

The Cambie Street entrance, stairs, and ramp to the Food Court are now closed as we build a new entrance to the shopping centre. We expect to re-open the doors Fall 2019. For accessibility, please reroute through White Spot entrance/Canada Line Plaza to access Cambie Street.

The underpass to exit to Westbound on 41st is now permanently CLOSED to allow for utility upgrades. Cars wanting to travel Westbound on 41st Avenue should use Exit #8 onto Northbound  Cambie Street.

Look Ahead:

New street light with westbound access to 41st Avenue will be coming in October 2019.

 

Please click here to see maps.

Please refer to the Where To Shop section of our website for the most current store openings and re-locations.